![]() The terminal at NW 215th will have an interface to Broward county in the future. The extension line will run north from a junction with the existing route at Dr Martin Luther King Jr Metrorail station to NW 215th Street, just south of Florida’s turnpike. It is a double-track, heavy-rail extension of the metrorail system. ![]() The North Corridor Extension project includes construction of a new elevated Orange line of 15km (9.2 miles). A $1m grant has also been provided by the US House of Representatives, taken from federal funds to allow construction to take place. This will contribute towards the construction of Metrorail’s North Corridor Extension. ![]() Following a public vote, a decision was made for a half-cent sales tax to be introduced to provide funding for public transport improvements. ![]()
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |